Slocum glider (G2) 403 Leonardo

BIOTREC


NEWS

06 May 2020:

The Slocum glider 402 and 403 returned back to OGS after a complete refurbishment at the factory Glider-1 Glider-2

27 May 2019:

The Slocum glider 402 and 403 were sent to the factory for a complete check and refurbishment Glider-1 Glider-2

09 February 2019:

The Convex19 mission in the South Adriatic sea was completed and the slocum glider Leonardo was safely recovered after 11 days. Glider Glidermission

29 January 2019:

The slocum glider Leonardo was deployed in the South Adriatic Sea for the Bari-Dubrovnik transect (Convex19 mission) Glider Glidermission

17 February 2018:

The Slocum glider 403 Leonardo was successfully recovered after a 20-day mission in the South Adriatic Sea. Glider Glidermission



Scientific data


  • gallery thumbnail
  • gallery thumbnail
  • gallery thumbnail
  • gallery thumbnail
  • gallery thumbnail
  • gallery thumbnail
  • gallery thumbnail
  • gallery thumbnail
  • gallery thumbnail
  • gallery thumbnail